In Mníšek pod Brdy, we replaced the original metal obstacles set on rough asphalt with a new concrete skatepark.
Despite the limited space, we designed a diverse layout of features — a street section, a miniramp connected to a ditch with a corner, and technical sections with slanted rails and ledges.
The project also includes a dedicated space for a land-art element — a shading textile that, in addition to its aesthetic value, enhances comfort during the summer months.
The obstacles were designed in collaboration with the local community under the guidance of Tadeáš Červenka. In addition to the riding features, the skatepark is equipped with essential amenities — a drinking fountain, benches, and a waste bin — and also public lighting that extends its hours of use.
In Mníšek pod Brdy, we replaced the original metal obstacles set on rough asphalt with a new concrete skatepark.
Despite the limited space, we designed a diverse layout of features — a street section, a miniramp connected to a ditch with a corner, and technical sections with slanted rails and ledges.
The project also includes a dedicated space for a land-art element — a shading textile that, in addition to its aesthetic value, enhances comfort during the summer months.
The obstacles were designed in collaboration with the local community under the guidance of Tadeáš Červenka. In addition to the riding features, the skatepark is equipped with essential amenities — a drinking fountain, benches, and a waste bin — and also public lighting that extends its hours of use.
In Mníšek pod Brdy, we replaced the original metal obstacles set on rough asphalt with a new concrete skatepark.
Despite the limited space, we designed a diverse layout of features — a street section, a miniramp connected to a ditch with a corner, and technical sections with slanted rails and ledges.
The project also includes a dedicated space for a land-art element — a shading textile that, in addition to its aesthetic value, enhances comfort during the summer months.
The obstacles were designed in collaboration with the local community under the guidance of Tadeáš Červenka. In addition to the riding features, the skatepark is equipped with essential amenities — a drinking fountain, benches, and a waste bin — and also public lighting that extends its hours of use.
In Mníšek pod Brdy, we replaced the original metal obstacles set on rough asphalt with a new concrete skatepark.
Despite the limited space, we designed a diverse layout of features — a street section, a miniramp connected to a ditch with a corner, and technical sections with slanted rails and ledges.
The project also includes a dedicated space for a land-art element — a shading textile that, in addition to its aesthetic value, enhances comfort during the summer months.
The obstacles were designed in collaboration with the local community under the guidance of Tadeáš Červenka. In addition to the riding features, the skatepark is equipped with essential amenities — a drinking fountain, benches, and a waste bin — and also public lighting that extends its hours of use.
In Mníšek pod Brdy, we replaced the original metal obstacles set on rough asphalt with a new concrete skatepark.
Despite the limited space, we designed a diverse layout of features — a street section, a miniramp connected to a ditch with a corner, and technical sections with slanted rails and ledges.
The project also includes a dedicated space for a land-art element — a shading textile that, in addition to its aesthetic value, enhances comfort during the summer months.
The obstacles were designed in collaboration with the local community under the guidance of Tadeáš Červenka. In addition to the riding features, the skatepark is equipped with essential amenities — a drinking fountain, benches, and a waste bin — and also public lighting that extends its hours of use.
CLIENT City of Mníšek pod Brdy
CLIENT City of Mníšek pod Brdy
CLIENT City of Mníšek pod Brdy
CLIENT City of Mníšek pod Brdy
CLIENT City of Mníšek pod Brdy
YEAR 2026
YEAR 2026
YEAR 2026
YEAR 2026
YEAR 2026
STATUS Completed
STATUS Completed
STATUS Completed
STATUS Completed
STATUS Completed
LOCATION Mníšek pod Brdy
LOCATION Mníšek pod Brdy
LOCATION Mníšek pod Brdy
LOCATION Mníšek pod Brdy
LOCATION Mníšek pod Brdy
SIZE 500 m2
SIZE 500 m2
SIZE 500 m2
SIZE 500 m2
SIZE 500 m2


/ original state of the site
/ original state of the site
/ original state of the site
/ original state of the site
/ original state of the site

/ miniramp
/ miniramp
/ miniramp
/ miniramp
/ miniramp





/ staircase
/ skateplaza
/ staircase
/ staircase
/ staircase
/ street section
/ street section
/ street section
/ street section
/ street section


/ technical section
/ technical section
/ technical section
/ technical section
/ technical section
/ lighting
/ lighting
/ lighting
/ lighting
/ lighting


OTHER PROJECTS
OTHER PROJECTS
U / U Studio s.r.o.
IČ: 09147373
Account number: 2296957002/5500
Studio / mailing adress:
Kamenická 5
Praha 7 Letná
170 00
Headquarters:
Křišťanova 1638/12
Praha 3 Žižkov
130 00
info@uustudio.cz
+420 724 819 859
© U / U Studio s.r.o. 2023