Leisure park Choceň

Leisure park Choceň

Leisure park Choceň

Leisure park Choceň

Leisure park Choceň

The first phase of the leisure park project in Choceň focuses on the construction of a skatepark, pump track, and facilities. These three functional units can be implemented separately, depending on available funding. The skatepark, the dominant element of the design, is created with an emphasis on smooth riding and is connected to the pump track through elevated platforms. The minimalist facilities consist of a wooden structure made from recycled materials. The first phase of the project aims not only to support the riding community but also to attract a wider audience and lay the groundwork for the future expansion of the park.
In the following phases, the project will be expanded to include additional activities such as a bowl, parkour/workout area, bouldering, streetball, teqball, and pétanque. These elements are arranged with safety and mutual interaction in mind. For example, pétanque is placed closer to pedestrian pathways, while the streetball court is positioned against an existing slope, naturally preventing stray balls from escaping without the need for protective nets. The dominant feature of this section will be a spacious pavilion with an adjacent paved area for a food truck, providing a welcoming space for visitors and those waiting for a train, offering a natural alternative to a traditional railway waiting area.

The first phase of the leisure park project in Choceň focuses on the construction of a skatepark, pump track, and facilities. These three functional units can be implemented separately, depending on available funding. The skatepark, the dominant element of the design, is created with an emphasis on smooth riding and is connected to the pump track through elevated platforms. The minimalist facilities consist of a wooden structure made from recycled materials. The first phase of the project aims not only to support the riding community but also to attract a wider audience and lay the groundwork for the future expansion of the park.
In the following phases, the project will be expanded to include additional activities such as a bowl, parkour/workout area, bouldering, streetball, teqball, and pétanque. These elements are arranged with safety and mutual interaction in mind. For example, pétanque is placed closer to pedestrian pathways, while the streetball court is positioned against an existing slope, naturally preventing stray balls from escaping without the need for protective nets. The dominant feature of this section will be a spacious pavilion with an adjacent paved area for a food truck, providing a welcoming space for visitors and those waiting for a train, offering a natural alternative to a traditional railway waiting area.

The first phase of the leisure park project in Choceň focuses on the construction of a skatepark, pump track, and facilities. These three functional units can be implemented separately, depending on available funding. The skatepark, the dominant element of the design, is created with an emphasis on smooth riding and is connected to the pump track through elevated platforms. The minimalist facilities consist of a wooden structure made from recycled materials. The first phase of the project aims not only to support the riding community but also to attract a wider audience and lay the groundwork for the future expansion of the park.
In the following phases, the project will be expanded to include additional activities such as a bowl, parkour/workout area, bouldering, streetball, teqball, and pétanque. These elements are arranged with safety and mutual interaction in mind. For example, pétanque is placed closer to pedestrian pathways, while the streetball court is positioned against an existing slope, naturally preventing stray balls from escaping without the need for protective nets. The dominant feature of this section will be a spacious pavilion with an adjacent paved area for a food truck, providing a welcoming space for visitors and those waiting for a train, offering a natural alternative to a traditional railway waiting area.

The first phase of the leisure park project in Choceň focuses on the construction of a skatepark, pump track, and facilities. These three functional units can be implemented separately, depending on available funding. The skatepark, the dominant element of the design, is created with an emphasis on smooth riding and is connected to the pump track through elevated platforms. The minimalist facilities consist of a wooden structure made from recycled materials. The first phase of the project aims not only to support the riding community but also to attract a wider audience and lay the groundwork for the future expansion of the park.
In the following phases, the project will be expanded to include additional activities such as a bowl, parkour/workout area, bouldering, streetball, teqball, and pétanque. These elements are arranged with safety and mutual interaction in mind. For example, pétanque is placed closer to pedestrian pathways, while the streetball court is positioned against an existing slope, naturally preventing stray balls from escaping without the need for protective nets. The dominant feature of this section will be a spacious pavilion with an adjacent paved area for a food truck, providing a welcoming space for visitors and those waiting for a train, offering a natural alternative to a traditional railway waiting area.

The first phase of the leisure park project in Choceň focuses on the construction of a skatepark, pump track, and facilities. These three functional units can be implemented separately, depending on available funding. The skatepark, the dominant element of the design, is created with an emphasis on smooth riding and is connected to the pump track through elevated platforms. The minimalist facilities consist of a wooden structure made from recycled materials. The first phase of the project aims not only to support the riding community but also to attract a wider audience and lay the groundwork for the future expansion of the park. In the following phases, the project will be expanded to include additional activities such as a bowl, parkour/workout area, bouldering, streetball, teqball, and pétanque. These elements are arranged with safety and mutual interaction in mind. For example, pétanque is placed closer to pedestrian pathways, while the streetball court is positioned against an existing slope, naturally preventing stray balls from escaping without the need for protective nets. The dominant feature of this section will be a spacious pavilion with an adjacent paved area for a food truck, providing a welcoming space for visitors and those waiting for a train, offering a natural alternative to a traditional railway waiting area.

CLIENT                Municipality of Choceň 

CLIENT                 Municipality of Choceň

CLIENT             Municipality of Choceň

CLIENT              Municipality of Choceň 

CLIENT                Municipality of Choceň 

YEAR                    2024

YEAR                     2024

YEAR                 2024

YEAR                  2024

YEAR                    2024

STATUS                Architectural study

STATUS                 Architectural study

STATUS             Architectural study

STATUS              Architectural study

STATUS                Architectural study

VELIKOST           8928 m2

SIZE                      8928 m2

SIZE                  8928 m2

SIZE                    8928 m2

SIZE                      8928 m2

LOACTION          Choceň 

LOCATION           Choceň

LOCATION       Choceň

LOCATION         Choceň  

LOCATION            Choceň 

6 kopie
stávající stav

/ original state of the site

/ original state of the site

/ original state of the site

/ original state of the site

/ original state of the site

situace eng
axo eng
AXO_SKATE_eng4

/ skatepark

/skatepark

/ skatepark

/ skatepark

/ skatepark

6 kopie
DCIM102MEDIADJI_0199.JPG
4 kopie
2 kopie
4 kopie

OTHER PROJECTS

U / U Studio s.r.o.

IČ: 09147373
Číslo účtu: 2296957002/5500

Ateliér / korespondenční adresa:
Kamenická 5
Praha 7 Letná
170 00

Sídlo:
Křišťanova 1638/12 
Praha 3 Žižkov
130 00

info@uustudio.cz
+420 724 819 859

© U / U Studio s.r.o. 2023