The proposal revitalizes and connects the sports area with the existing recreation zone. The curves are based on the shapes of the other paths in the park so that the Krajinka complex gives a unified impression. Existing greenery, furniture and water fountains are used and adapted for better functioning. (Relocation of existing furniture to a more appropriate arrangement, creation of shade by newly planted trees and conversion of one water fountain to a fountain). The water feature will act as an air cooler in the summer months and as a play feature for children. If there is no water in the fountain, it will serve as an obstacle in the skatepark. The perimeter of the skate plaza is lined with a wall that is clad in burnt red brick and is illuminated by lights from the concrete floor. This interacts with the walls of the historic town, which is located on the other bank across the Ohře River.
The proposal revitalizes and connects the sports area with the existing recreation zone. The curves are based on the shapes of the other paths in the park so that the Krajinka complex gives a unified impression. Existing greenery, furniture and water fountains are used and adapted for better functioning. (Relocation of existing furniture to a more appropriate arrangement, creation of shade by newly planted trees and conversion of one water fountain to a fountain). The water feature will act as an air cooler in the summer months and as a play feature for children. If there is no water in the fountain, it will serve as an obstacle in the skatepark. The perimeter of the skate plaza is lined with a wall that is clad in burnt red brick and is illuminated by lights from the concrete floor. This interacts with the walls of the historic town, which is located on the other bank across the Ohře River.
The proposal revitalizes and connects the sports area with the existing recreation zone. The curves are based on the shapes of the other paths in the park so that the Krajinka complex gives a unified impression. Existing greenery, furniture and water fountains are used and adapted for better functioning. (Relocation of existing furniture to a more appropriate arrangement, creation of shade by newly planted trees and conversion of one water fountain to a fountain). The water feature will act as an air cooler in the summer months and as a play feature for children. If there is no water in the fountain, it will serve as an obstacle in the skatepark. The perimeter of the skate plaza is lined with a wall that is clad in burnt red brick and is illuminated by lights from the concrete floor. This interacts with the walls of the historic town, which is located on the other bank across the Ohře River.
The proposal revitalizes and connects the sports area with the existing recreation zone. The curves are based on the shapes of the other paths in the park so that the Krajinka complex gives a unified impression. Existing greenery, furniture and water fountains are used and adapted for better functioning. (Relocation of existing furniture to a more appropriate arrangement, creation of shade by newly planted trees and conversion of one water fountain to a fountain). The water feature will act as an air cooler in the summer months and as a play feature for children. If there is no water in the fountain, it will serve as an obstacle in the skatepark. The perimeter of the skate plaza is lined with a wall that is clad in burnt red brick and is illuminated by lights from the concrete floor. This interacts with the walls of the historic town, which is located on the other bank across the Ohře River.
The proposal revitalizes and connects the sports area with the existing recreation zone. The curves are based on the shapes of the other paths in the park so that the Krajinka complex gives a unified impression. Existing greenery, furniture and water fountains are used and adapted for better functioning. (Relocation of existing furniture to a more appropriate arrangement, creation of shade by newly planted trees and conversion of one water fountain to a fountain). The water feature will act as an air cooler in the summer months and as a play feature for children. If there is no water in the fountain, it will serve as an obstacle in the skatepark. The perimeter of the skate plaza is lined with a wall that is clad in burnt red brick and is illuminated by lights from the concrete floor. This interacts with the walls of the historic town, which is located on the other bank across the Ohře River.
CLIENT Cheb city
CLIENT Cheb city
CLIENT Cheb city
CLIENT Cheb city
CLIENT Cheb city
YEAR 2022
YEAR 2022
YEAR 2022
YEAR 2022
YEAR 2022
STATUS Completed
STATUS Completed
STATUS Completed
STATUS Completed
STATUS Completed
LOCATION Sportovní areál Krajinka
LOCATION Sportovní areál Krajinka
LOCATION Sportovní areál Krajinka
LOCATION Sportovní areál Krajinka
LOCATION Sportovní areál Krajinka
SIZE 3000 m2
SIZE 3000 m2
SIZE 3000 m2
SIZE 3000 m2
SIZE 3000 m2
/ original state of the site
/ original state of the site
/ original state of the site
/ original state of the site
/ original state of the site
walls / skatepark
wall / skatepark
wall / skatepark
wall / skatepark
walls / skatepark
context / materails
context / materials
context / materials
context / materials
context / materials
OTHER PROJECTS
U / U Studio s.r.o.
IČ: 09147373
Číslo účtu: 2296957002/5500
Ateliér / korespondenční adresa:
Kamenická 5
Praha 7 Letná
170 00
Sídlo:
Křišťanova 1638/12
Praha 3 Žižkov
130 00
info@uustudio.cz
+420 724 819 859
© U / U Studio s.r.o. 2023